
Every Digital Waste Tracking date, and which one is yours.
Digital Waste Tracking is DEFRA's national record for every waste movement, and it arrives in two phases. Sites that take waste in are bound from October 2026. Carriers, brokers and dealers follow in October 2027. Here is the whole timetable, and what each date asks of you.
What is Digital Waste Tracking?
DEFRA is replacing the paper trail that follows a load of waste with one national digital record for every controlled-waste movement (controlled waste being the everyday business, commercial and household waste the rules cover).
Today, when waste changes hands, a paper waste transfer note travels with it. That note is the duty-of-care record: it says what the waste is, who produced it, who carried it, and where it ended up. Hazardous loads carry a second document called a consignment note. Digital Waste Tracking replaces both with a single record that everyone in the chain updates online.
Each record holds much the same information you already put on a transfer note, in a set format: an EWC code (the six-digit European Waste Catalogue number that classifies a waste) and a plain description of what it is, the weight, whether any of it is hazardous or contains POPs (persistent organic pollutants, a group of harmful chemicals found in things like some older sofas and foams), who produced and carried it along with the carrier's registration number, and where it was taken and what happens to it there.
When a record is submitted, DEFRA hands back a Waste Tracking ID, a unique reference for that movement. CarrierNote stores that ID against the record for you. A receiving site's incoming loads are filed with DEFRA today, and carrier movements are built and waiting to send the moment DEFRA opens that step.
A receiving site has until the end of the second working day after a load arrives to complete its record, and weekends and bank holidays don't count towards it. Carriers get their own timing rule with Phase 2, which DEFRA hasn't published yet. Either way CarrierNote keeps a clock on every record, so nothing slips past its deadline.
Two phases, and the one that is yours

If you take waste in, your date is October 2026, or January 2027 in Scotland
Transfer stations, treatment sites, tips and anywhere else permitted to accept waste go first. From your date you record every load you take in.
- 28 April 2026
- Public beta opens. Any permitted receiving site can join and try the service before it has to.
- By summer 2026
- The four nations lay the regulations that put Phase 1 into law.
- October 2026
- Mandatory in England and Wales.
- January 2027
- Mandatory in Scotland and Northern Ireland.
If you carry, broker or deal in waste, your date is October 2027
Carriers, brokers, dealers and exporters follow a year later. The sites you tip at record your loads digitally from October 2026, so you feel the change from that date rather than from your own.
- Autumn 2026
- Private beta, by invitation, for carriers and software providers.
- Spring 2027
- Public beta. Open to everyone in scope, and voluntary.
- October 2027
- Mandatory for carriers, brokers, dealers and exporters.
Arriving after your own date, because you are newly permitted or because the business has run on paper until now? The timetable does not change the job, and you can be recording loads the day you sign up.
Phase 2 has moved once already, from April 2027 to October 2027. DEFRA treats the dates as firm and so do we, but they have shifted before, so we watch for changes and keep this page current.
Once the service is mandatory for your business, DEFRA charges £26 a year per legal entity that creates or edits records, paid upfront for a rolling twelve months. That is a government charge you pay DEFRA, and it is separate from what you pay us for software.
Download the Digital Waste Tracking readiness pack
A short PDF with the dates that apply in your nation and a checklist of what to have in place, for receiving sites and for carriers. Leave your email and it downloads straight away.
In scope, and not in scope
Worth being plain about, because there is a lot of confident nonsense doing the rounds.
Every controlled-waste movement is in scope, hazardous and non-hazardous alike, and there is no minimum weight. One bag counts the same as a full skip.
Waste producers are not yet mandated. DEFRA's stated order is receiving sites first, then carriers, then a decision about producers. If your business only produces waste, you have nothing to file today, and anyone telling you that all producers must register from October 2026 is wrong.
Waste exemption holders are not in Phase 1, and come in with Phase 2, though DEFRA is looking at whether some of those sectors are brought in sooner. For now, extractive waste that never leaves a quarry or a mine, animal by-products and radioactive materials sit outside the service altogether, under rules of their own.
Paper and the old returns run alongside, for now
Digital Waste Tracking does not switch the old paperwork off on day one. Through the transition you keep your duty-of-care records the way you keep them now, including the two-year retention. Hazardous consignee returns carry on. Waste Data Flow, the separate national system local authorities report waste and recycling data through, sits outside the programme and stays where it is. Your waste carrier licence is a different registration again, held with the Environment Agency in England, or with SEPA, Natural Resources Wales or DAERA in the other three nations, and it carries on too.
So for a while you are doing both, which DEFRA acknowledges and treats as the price of the change. It is also the best argument for capturing a load once in software and letting it feed whatever each obligation needs, rather than writing the same facts out twice. If that means moving off a duplicate book, switching from paper says what changes on day one and what happens to the paper you already hold.
Simpler Recycling
A separate set of reforms about how waste is sorted, not how it's tracked.
Simpler Recycling and Digital Waste Tracking often get mentioned in the same breath, but they are different things. Simpler Recycling is about standardising which materials are separated out for recycling, so the rules are the same across the country rather than changing from one council to the next. Digital Waste Tracking is about recording the movement once the waste is on the move. If you handle other businesses' waste you will come across both, so it is worth knowing they are separate obligations with their own timelines.
On the list, connected, and ready for both dates
You can start on your next load, and you don't have to take our word for any of it.
On the list and connected
- On the GOV.UK software provider list for Digital Waste Tracking
- A receiving site's incoming loads are filed with DEFRA today, and the Waste Tracking ID is stored against the record
- Carrier movements are built and ready to send the moment DEFRA opens that step
- Records kept for as long as the law requires: two years for a transfer note, three for a hazardous consignment note
Built where the waste changes hands
- Structured capture of every field the record needs, at the gate or at the kerbside
- Checks that flag a problem before anything is sent
- Electronic signatures at the point the waste changes hands
- Works offline for drivers with no signal
Get the dates as they change
We keep this page current, but nobody sits refreshing a timetable. Leave your email and the change comes to you instead.
Get set up for whichever date is yours
Get your waste records onto CarrierNote. It logs a receiving site's incoming loads and files them with DEFRA today, and it's ready to send carrier movements the moment DEFRA opens that step. The free plan is ten waste movements a calendar month on real jobs rather than a demo, with no card and no time limit.