R13: Storage pending recovery
Waste is stored until it goes on to one of R1 to R12. Waste waiting to be collected from the place it was produced doesn't count.
The legal wording
Storage of waste pending any of the operations numbered R 1 to R 12 (excluding temporary storage, pending collection, on the site where the waste is produced)
The annex adds, in a footnote: Temporary storage means preliminary storage according to point (10) of Article 3.
From Annex II to the Waste Framework Directive, which the Digital Waste Tracking (England) Regulations 2026 point to for every R code.
Recovery in the waste hierarchy
R13 is a recovery operation. The waste hierarchy ranks recovery above disposal, and a business that passes waste on has to take the reasonable steps open to it to follow that order.
It's a step on the way to another operation, so it fits a site that holds or prepares waste and then sends it on.
The disposal code to compare it with is D15: Storage pending disposal.
On a Digital Waste Tracking receipt
For each EWC code (the six-digit code from the List of Wastes that says what a waste is) on a receipt, the site that takes the waste in records the D code or the R code, or both, for what it will do with it, and the weight each code covers.
Sources
- Annex I to the Waste Framework Directive: disposal operations
- Annex II to the Waste Framework Directive: recovery operations
- The Digital Waste Tracking (England) Regulations 2026: Sch. 1, para. 14: the D or R code for each waste code on a receipt
- The Waste (England and Wales) Regulations 2011, regulation 12: the waste hierarchy
- DEFRA: Digital Waste Tracking production approval tests: test R04, a receipt with no D or R code, accepted with a warning
Get the next guide by email
We write a plain-English guide whenever the Digital Waste Tracking rules move, and these reference pages get updated with them. Leave your email and the next one comes to you.
Start on the free plan
CarrierNote is on the GOV.UK software provider list, connected to DEFRA's Digital Waste Tracking service. Receiving sites are in scope from October 2026 and carriers from October 2027, and you can be recording to DEFRA's standard from your first load, whenever you start.